All legislation

تعميم Circular No. 37 03/12/2019

Unofficial English title

Awaiting completion of the construction of buildings for public administrations so that the State and its official administrations can dispense with the burdens and costs of renting buildings and facilities

Official title, in Arabic انتظار الانتهاء من تشييد ابنية للادارات العامة في سبيل استغناء الدولة واداراتها الرسمية عن اعباء واكلاف استئجار المباني والانشاءات

The Arabic title and text are the official version, and the more accurate one. This English title is a machine translation to help you find the text.

Circular No. 37 of 3 Dec 2019. Published in Official Gazette issue 56 of 5 Dec 2019. No repeal recorded in our sources.

Type
تعميم · Circular
Number
37
Date
03/12/2019
Official Gazette
Issue 56, 05/12/2019, p. 3963
Status
No repeal recorded
Follow
Changes to this text, as a feed
Cite as
تعميم رقم 37 تاريخ 03/12/2019
Source
Lebanese University

بإنتظار الإنتهاء من تشييد أبنية للادارات العامة في سبيل استغناء الدولة وإداراتها الرسمية عن أعباء وأكلاف استئجار المباني والإنشاءات التي تشغلها كمراكز ومكاتب لها وفقا لما جاء في المادة /16/ من القانون رقم 79 تاريخ 18/4/2018 (الموازنة العامة الموازنات الملحقة لعام 2018)، والمادة /14/ من القانون رقم 144 تاريخ 31/7/2019 (الموازنة العامة الموازنات الملحقة لعام 2019)،

يُطلب الى الإدارات العامة والمؤسسات العامة والبلديات وإتحاد البلديات والهيئات العامة، التي تشغل بالإيجار اماكن لممارسة أعمالها، مباشرة التفاوض مع المؤجرين بهدف تخفيض بدلات الإيجار بشكل يتناسب مع أوضاع المالية العامة ويتماشى مع التخفيض الذي طرأ على بدلات الإيجار بشكل عام، ووضع تقرير مفصل بهذا الخصوص ورفعه الى مجلس الخدمة المدنية - إدارة الأبحاث والتوجيه، خلال مهلة شهر من تاريخ نشر هذا التعميم في الجريدة الرسمية.

Related

More from the same year.

2019